Skip to content
< show all services

Arboricultural Method Statement & Tree Protection Plan

The tree protection plan identifies the trees retention and removal categories in the British Standard 5837 colour coding. This tree protection plan includes the precise location / type of tree protective fencing.

The accompanying arboricultural method statement describes how the protective fencing is to be maintained during the construction process including proposals that might include:

  • Car parking
  • Depth and foundation type for driveways
  • Protection of soil structure and tree root activity
  • Requirements of any supplementary planning guidance
  • Safe storage of materials
  • Site access
  • Space needed for construction works including turning circles of heavy plant
  • Specifications for tree root pruning

The arboricultural method statements and tree protection plan describes the measures taken to ensure tree protection during the construction process.

For more information, please contact us

© Copyright 2012 Urban Forestry Group. Site design - E-C Plus Ltd, Web Design and Search Engine Optimisation